Resource Table

Etango Project Mineral Resource Estimate
October 2010

 

By deposit reported at a cut-off grade of 100ppm U3O8

 

Measured Resources

Indicated Resources

Measured & Indicated Resources

Inferred Resources

Deposit

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

 

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

Etango

62.7

205

12,900

28.3

273.5

200

54,600

120.4

336.2

201

67,500

148.7

45.7

202

9,200

20.3

Ondjamba

-

-

-

-

-

-

-

-

-

-

-

-

85.1

166

14,200

31.3

Hyena

-

-

-

-

-

-

-

-

-

-

-

-

33.6

166

5,600

12.3

Total

62.7

205

12,900

28.3

273.5

200

54,600

120.4

336.2

201

67,500

148.7

164.6

176

29,000

63.9

 

Note: Figures may not add due to rounding; Ordinary Kriged estimate based upon 3m cut composites; bulk density of 2.64t/m3; and panel dimensions of 25mNS by 25mEW by 10mRL.

 

Total estimate reported at a range of cut-off grades

 

Measured Resources

Indicated Resources

Measured & Indicated Resources

Inferred Resources

Cut-off
Grade

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

Tonnes

Grade

Contained U3O8

(ppm U3O8)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

(Mt)

(ppm U3O8)

(Tonnes)

(Mlbs)

100

62.7

205

12,900

28.3

273.5

200

54,600

120.4

336.2

201

67,500

148.7

164.6

176

29,000

63.9

125

56.6

215

12,200

26.8

238.6

212

50,700

111.7

295.2

213

62,900

138.5

143.9

185

26,600

58.6

150

47.5

230

10,900

24.0

193.7

230

44,500

98.1

241.2

230

55,400

122.1

106.1

201

21,400

47.1

 

Note: Figures may not add due to rounding; Ordinary Kriged estimate based upon 3m cut composites; bulk density of 2.64t/m3; and panel dimensions of 25mNS by 25mEW by 10mRL.

 

The information in this table relating to the Mineral Resources of the Etango Project is based on a resource estimate completed by Mr Neil Inwood, and the information in this report relating to the Mineral Resources of the Ondjamba and Hyena deposits is based on a resource estimate completed by Mr Neil Inwood and Mr Steve Le Brun.  Both Mr Inwood and Mr Le Brun are full time employees of Coffey Mining Pty Ltd.  Each of Messrs. Inwood and Le Brun are Members of The Australasian Institute of Mining and Metallurgy and have sufficient experience relevant to the style of mineralisation and types of deposits under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, and are independent consultants to Bannerman and Qualified Persons as defined by Canadian National Instrument 43-101.  Messrs. Inwood and Le Brun consent to the inclusion in this report of the matters based on their information in the form and context in which it appears.

Privacy Policy & Legal / Site Map / Copyright © 2009 Bannerman Resources Limited | Designed by Platform Communications | Powered by Harmonic New Media